[NEXT FLOAT] Floating Bridge Installation

Due to NEXT FLOAT's advantage of modular system, it can be easily created any water-related structures such as Dock, Marina, Pier, Stage, and Bridge.

In this post, we are more than welcome to share its process of floating bridge construction.
Compare to concrete bridge, we can save up to millions dollars in cost, material and even construction wastes around its site.

There are many ways to install the floating bridges, but mainly we suggest two ways.
1) Pile Construction : High Wave (Sea)
2) Anchoring Consturction: Low Wave (Pond, Lake)

To help your brief understanding, here is short guideline,

1. Set up NEXT FLOAT (in small bulk layout)

2. Use crain to move the bulk of NEXT FLOAT on the water.


3. Assemble the each bulk of NEXT FLOAT by Manpower. 
(Use rope to pull or combine the NEXT FLOAT)

4. Lock up all the connection pin for NEXT FLOAT.

5. If there is gap from the ground, please use steel frame entrance for the pathway.

6. All job is done.
 
 
There are many ways to build the floating bridge, it is just one example of its guideline.
We hope it gave you just brief understanding to way to build.
 
 
Any question or comment, feel free to contact us at nextexport@next700.com
 
 

 
 
 